Thursday, July 19, 2012

The Quest For Oil

Second section at Pittsfield
Lead oil train.  NMJ
A trio of us headed north today (Thursday 7/19/12) in search of oil...


The first half of the most recent test oil train was in NMJ when we arrived around 10am and it was still there around 2pm when we left the area. 

Second section at Pittsfield
We watched the second half pass through Pittsfield (same as reported on GRS Sightings List).  However, it only got as far as Detroit just down the road.  The lead 2 units switched the feed mill and then the crew ran out of time or something.  We left at about 4pm with the train held up in Detroit.

We did not hear the first oil train leave NMJ on the scanner while we were in scanner range.   We could hear the Bucksport local and NM-1 in that same general area until south of Waterville.

If we had had time, we would have chased after the BNSF power that got a Form D to head west from Waterville around 5-6pm.  "C an E Extra BNSF xxxx"...   No six axles east of Waterville today.

BC

Pittsfield

Pittsfield


Pittsfield
Second section at Pittsfield



1267 = Class 3 Petroleum Crude Oil




















Switching the Detroit feed mill.

No comments:

Post a Comment